Building permits. No building permit issued by the Building Inspector shall be construed as any guarantee or warranty by the municipality that the permitted structure conforms to all of the requirements of these Regulations. If the action of the Building Inspector is appealed as provided by these Regulations, or the General Statutes of the State of Connecticut, the holder of such building permit shall not exercise the privileges granted therein except at their own risk.
The Building Inspector shall not issue any building permit for the construction or substantial alteration of any building(s) located on any lot that is likely to be affected by a pending proposal for a zone change or existing district boundary that is before the Zoning Commission until the Commission makes its final determination, following the appropriate public hearing process. The clerk of the Zoning Commission shall immediately provide written notice to the Building Inspector of the pendency of such motion and of the final decision thereon.