In addition to best management practices currently available, and in the absence of specific design criteria which may not be identified in these documents or other requirements of the Town, the applicant shall, at a minimum, design the stormwater collection system to retain the first 1.3 inches of runoff from impervious areas on site, and provide a zero increase in the peak rate of runoff from the site for the twenty-five-year storm, with an evaluation of the impacts from a fifty- and 100-year storm. After the evaluation is complete, if a larger design storm is warranted as determined in consultation with the Town Engineer, the applicant shall design the drainage for no net increase in the peak runoff rates generated from the 100-year storm.